Montage Tijden Conform Gustav Ende [better] — Tabel
| Schroef diameter | Aantal slagen | Tijd per schroef (centimin) | |------------------|---------------|-----------------------------| | M3 | 3 volledige omw | 8.5 | | M4 | 4 volledige omw | 11.0 | | M5 | 5 volledige omw | 14.0 |
Note: Gustav Ende is a fictional construct in this context, representing the archetype of a German efficiency engineer from the early 20th century (e.g., a contemporary of Taylor or Ford). This article treats "Ende’s method" as a theoretical model for hyper-optimized assembly. TABEL MONTAGE TIJDEN CONFORM GUSTAV ENDE
The "Tabel Montage Tijden" provides a "norm time" for specific components, usually expressed in (e.g., per piece) or minutes per meter . To find the total installation time, you multiply this norm by the project quantity. Sample Calculation (Mechanical) | Schroef diameter | Aantal slagen | Tijd
| Element | Table time | |---------|-------------| | Pick up bolt | 0.25 min | | Pick up washer | 0.20 min | | Place washer on bolt | 0.15 min | | Position bolt in hole | 0.30 min | | Screw in 4 turns by hand | 0.40 min | | Pick up wrench | 0.25 min | | Tighten 2 turns with wrench | 0.50 min | | Lay down wrench | 0.15 min | To find the total installation time, you multiply
In the chaotic world of construction planning, where "guesstimation" is often the norm and budget overruns are accepted with a resigned sigh, the arrives like a cold shower—unpleasant at first, but ultimately invigorating in its clarity.
Tijden worden vaak uitgedrukt in "ploegminuten" of "man-minuten" per eenheid (bijv. per meter buis of per stuks onderdeel).
Vergelijkende studies over de nauwkeurigheid van deze normen ten opzichte van Uneto-VNI zijn te vinden in de kennisbank van TVVL .